Length general: 270.8m Beam optimum: 39.7m Hull: 32.2m Displacement standard: 41187t Comprehensive load: 43054t The USS LEXINGTON (CV-2), was at truth initially designated CC-1.Authorized become completed as an aircraft provider 1 July 1922, commissioned 14 December 1927.On 7 December 1941, LEXINGTON based at Pearl Harbor, whenever term of Japanese assault on Pearl Harbor was in fact gotten, She immediately established search airplane to acquire japan fleet. On 7 may 1942 LEXINGTON'S environment team sank japan light provider SHOHO. 8th, LEXINGTON was certainly struck by 2 torpedoes and 3 bombs, finally rolled over on her component and sank. LEXINGTON received 2 battle a-listers on her behalf World War II solution.
Specification
Copyright © 2008-2024 rcjaz.ca All rights reserved